Browse thousands of jobs & apply anytime, anywhere.

Construction Scheduler - Power Plant job in Windsor, CT

Share:

Job summary

Construction Scheduler - Power Plant
Location: Windsor, CT Category: Engineering
Status: Temporary/Contract Reference: US_EN_2_107684_258171
Posted: July 16,2014 Salary: N/A

Print image email image
Apply Now

Job description

Construction Scheduler job in Windsor CT

The successful candidate must be capable of developing a complete EPC project schedule from RFP specifications or related information and documentation with estimators, account representatives, district managers, or other senior staff executives, as well as provide technical oversight to less experienced scheduling personnel.

Responsibilities:

Reporting to the Manager of Field Operations Support, the individual will create work breakdown structures (WBS) and cost accounts to track and report cost, schedule and budget data, prepare time impact analysis, standardize Primavera software configurations and project control graphics and reports and interface with project team members as required.
Develop and maintain proposal schedules for bid submission.
Develop, track and report on resource loaded project schedules providing the project team and upper management with schedule performance critical path, earned value and variation analysis for full scope contract execution reflecting all phases of project execution through project close out.
Develop project recovery schedules and perform risk analysis with project team members.
Travel to job site locations around theU.S.is required.

Qualifications

Bachelors Degree in Engineering or related field or equivalent.
Strong construction scheduling experience essential within the power industry.
Minimum of 10 years experience in Project Controls, project planning and scheduling.
Hands on experience with Primavera Project Planner (P6) versions 6.0 – 7.0.
Experience with Microsoft Word, Excel, and Project
Proven experience with resource loading and earned value management reporting systems.
Must be able to handle multiple tasks and prioritize, be a team player, possess leadership qualities and have strong interpersonal skills.

If you are interested in this Construction Scheduler job opportunity in Windsor CT then please click APPLY NOW. For other opportunities available at Adecco Engineering and Technical go to www.adeccousa.com.

If you have questions about the position please contact jennifer.parker@adeccona.com

Equal Opportunity Employer Minorities/Women/Veterans/Disabled



Print image email image
Apply Now